Overview:
You will learn how to develop a tapering Y-piece.
Key and critical concepts which you will learn:
- All the elevation sizes must be within + 1,0mm of the required measurements.
- All the layout sizes must be within + 1,5mm of the required sizes
Tools, consumables, machinery and equipment required:
- Pencil, drawing paper, engineering drawings. Drawing equipment
Application:
Tapering Y-pieces are used where two reduced columns have to be taken from a main column.