fbpx
100%
light site-logo
  • Home
  • Courses
    • Induction & Safety
    • Electrician
      • Electrician
        • Phase 1
        • Phase 2
      • Millwright Electrician
        • Phase 1
        • Phase 2
      • Instrumentation
        • Phase 1
        • Phase 2
    • Mechanical
      • Fitter & Turner
        • Phase 1
        • Phase 2
      • Fitter
        • Phase 1
        • Phase 2
      • Turner
        • Phase 1
        • Phase 2
      • Millwright Fitter
        • Phase 1
        • Phase 2
      • Boilermaker / Plater / Welder / Sheet Metal Worker / Rigger
        • Boilermaker
          • Phase 1
          • Phase 2
        • Plater Boilermaker
          • Phase 1
          • Phase 2
        • Plater Welder
          • Phase 1
          • Phase 2
        • Sheet Metal Worker
          • Phase 1
          • Phase 2
        • Welder
          • Phase 1
          • Phase 2
        • Rigger
          • Phase 1
          • Phase 2
    • Automotive
      • Diesel Mechanic
        • Phase 1
        • Phase 2
      • Heavy Equipment Mechanic
        • Phase 1
        • Phase 2
      • Transportation Electrician
        • Phase 1
        • Phase 2
      • Motor Mechanic
        • Phase 1
        • Phase 2
      • Tractor Mechanic
        • Phase 1
        • Phase 2
  • About Us
  • News
  • Help
    • Report Bugs
    • Contact Us
    • Survey
Login
  • Home
  • About Us
  • Courses
  • Contact us
  • Survey
  • Report Bugs
  • Log In
Home Boilermaker - Phase 1 AS-2: Mark Off an Angle Iron Frame Check your Knowledge AS-2: Mark Off an Angle Iron Frame
Boilermaker – Phase 1
CCD: Course Control Document
Yet to Start
  • Check your Knowledge
    • CCD: Course Control Document
ST: Perform Safe Work Practice
Yet to Start
  • Check your Knowledge
    • ST: Perform Safe Work Practice
LOP: Lock Out Procedure
Yet to Start
  • Check your Knowledge
    • LOP: Lock Out Procedure
DRG-1: Read Engineering Drawings
Yet to Start
  • Check your Knowledge
    • DRG-1: Read Engineering Drawings
DRG-2: Draw up a Material List
Yet to Start
  • Check your Knowledge
    • DRG-2: Draw Up a Material List
HT-0: Use Hand Tools
Yet to Start
  • Check your Knowledge
    • HT-0: Use Hand Tools
HT-1: Fabricate a Drill Gauge
Yet to Start
  • Check your Knowledge
    • HT-1: Fabricate a Drill Gauge
HT-2: Sharpen a Drill
Yet to Start
  • Check your Knowledge
    • HT-2: Sharpen a Drill
HT-3: Identify Special Plater Tools
Yet to Start
  • Check your Knowledge
    • HT-3: Identify Special Plater Tools
OM-1: Operate a Pedestal Grinder
Yet to Start
  • Check your Knowledge
    • OM-1: Operate a Pedestal Grinder
OM-2: Operate a Drilling Machine
Yet to Start
  • Check your Knowledge
    • OM-2: Operate a Drilling Machine
OM-3: Operate a Guillotine Shearing Machine
Yet to Start
  • Check your Knowledge
    • OM-3: Operate a Guillotine Shearing Machine
OM-4: Operate a Punch & Shearing Machine
Yet to Start
  • Check your Knowledge
    • OM-4: Operate a Punch and Shearing Machine
OM-5: Operate a Bending Press Machine
Yet to Start
  • Check your Knowledge
    • OM-5: Operate a Bending Press Machine
OM-6: Operate a Bending Roll
Yet to Start
  • Check your Knowledge
    • OM-6: Operate a Bending Roll
PG: Use a Portable Grinder
Yet to Start
  • Check your Knowledge
    • PG: Use a Portable Grinder
MI: Identify Materials
Yet to Start
  • Check your Knowledge
    • MI: Identify Material
LM-1: Check and Maintain Lifting Equipment and Rigging Hardware
Yet to Start
  • Check your Knowledge
    • LM-1: Check and Maintain Lifting Equipment and Rigging Hardware
LM-2: Lift and Move a Load
Yet to Start
  • Check your Knowledge
    • LM-2: Lift and Move a Load
UL: Check and Use Ladders
Yet to Start
  • Check your Knowledge
    • UL: Check and Use Ladders
« ‹ › » page 1 / 3
Check your Knowledge

AS-2: Mark Off an Angle Iron Frame

Time limit: 0

Quiz Summary

0 of 4 questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 4 questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  1. Current
  2. Review
  3. Answered
  4. Incorrect
  1. Question 1 of 4
    1. Question

    The critical size for a toe-out angle iron frame is the.

    Correct

    Incorrect

  2. Question 2 of 4
    2. Question

    Use a __________ to mark off a 45° line from the 90° line to the toe on the top flange.

    Correct

    Incorrect

  3. Question 3 of 4
    3. Question

    All the lines must be drawn from the ________

    Correct

    Incorrect

  4. Question 4 of 4
    4. Question

    There must be about 3mm gap for the material that will be cut away.

    Correct

    Incorrect

Copyright 2020 - All Rights Reserved | Artisan Training Institute

This function has been disabled for Artisan Training Institute.

Survey

Report Testing Errors and Bugs